Turkish Airlines flight delay claim

Turkish Airlines is the flag carrier for Turkey and flies to destinations around the world from its hub in Istanbul. They have been increasing the number of routes they offer for some years to position themselves as a truly global player in the airline industry.

With its position straddling both Europe and Asia, Istanbul is the ideal connection point to destinations on all sides of the globe. They currently fly to over 80 destinations with daily flights into Germany to serve their expat community. Turkish Airlines is one of the fastest growing airlines in Europe at the moment, their fleet, amazing food and ambition will see them break into the top 3 European airlines sooner rather than later.

Turkish Airlines destination list 

Ankara (ESB)
Antalya (AYT)
Bodrum (BJV)
Istanbul (IST)
Marquette (SAW)
Abidjan (ABJ)
Abu Dhabi (AUH)
Accra (ACC)
Adana (ADA)
Addis Ababa (ADD)
Adler-Sochi (AER)
Al Najaf (NJF)
Alexandria (HBE)
Algiers (ALG)
Amman (AMM)
Aqaba (AQJ)
Asmara (ASM)
Athens (ATH)
Atlanta (ATL)
Baghdad (BGW)
Bahrain (BAH)
Bamako (BKO)
Bangkok (BKK)
Banjul (BJL)
Bari (BRI)
Basra (BSR)
Batumi (BUS)
Beijing (PEK)
Beirut (BEY)
Belgrade (BEG)
Bishkek (FRU)
Bogota (BOG)
Bologna (BLQ)
Boston (BOS)
Bucharest (OTP)
Buenos Aires (EZE)
Cairo (CAI)
Cancun (CUN)
Cape Town (CPT)
Casablanca (CMN)
Catania (CTA)
Chicago (ORD)
Cluj (CLJ)
Colombo (CMB)
Dakar (DSS)
Dalaman (DLM)
Dammam (DMM)
Dar Es Salaam (DAR)
Delhi (DEL)
Denpasar Bali (DPS)
Dhaka (DAC)
Diyarbakir (DIY)
Djibouti (JIB)
Doha (DOH)
Dubai (DXB)
Dubrovnik (DBV)
Durban (DUR)
Dushanbe (DYU)
Ekaterinburg (SVX)
Entebbe-Kampala (EBB)
Erbil (EBL)
Ercan (ECN)
Gaziantep (GZT)
Guangzhou (CAN)
Hanoi (HAN)
Havana (HAV)
Ho Chi Minh City (SGN)
Hong Kong (HKG)
Houston (IAH)
Hurghada (HRG)
Isfahan (IFN)
Islamabad (ISB)
Izmir (ADB)
Jakarta (CGK)
Jeddah (JED)
Johannesburg (JNB)
Kabul (KBL)
Karachi (KHI)
Kathmandu (KTM)
Kazan (KZN)
Kharkov (HRK)
Khartoum (KRT)
Kiev (KBP)
Kigali (KGL)
Kilimanjaro (JRO)
Kinshasa (FIH)
Kishinev (KIV)
Konya (KYA)
Kuala Lumpur (KUL)
Kuwait (KWI)
Lahore (LHE)
Ljubljana (LJU)
Los Angeles (LAX)
Lusaka (LUN)
Luxor (LXR)
Lvov (LWO)
Madinah (MED)
Mahe Island (SEZ)
Malaga (AGP)
Male (MLE)
Malta (MLA)
Manila (MNL)
Maputo (MPM)
Marrakech (RAK)
Mashhad (MHD)
Mauritius (MRU)
Mexico City (MEX)
Miami (MIA)
Milan (MXP)
Minsk (MSQ)
Mombasa (MBA)
Montreal (YUL)
Moscow (VKO)
Mumbai (BOM)
Muscat (MCT)
Nairobi (NBO)
Naples (NAP)
New York (JFK)
Odessa (ODS)
Oran (ORN)
Phuket (HKT)
Pisa (PSA)
Podgorica (TGD)
Pristina (PRN)
Riga (RIX)
Riyadh (RUH)
Rome (FCO)
San Francisco (SFO)
Sao Paulo (GRU)
Sarajevo (SJJ)
Seoul (ICN)
Shanghai (PVG)
Sharm El Sheikh (SSH)
Shiraz (SYZ)
Singapore (SIN)
Skopje (SKP)
Sofia (SOF)
St Petersburg (LED)
Sulaymaniyah (ISU)
Tabriz (TBZ)
Taipei (TPE)
Tallinn (TLL)
Tashkent (TAS)
Tbilisi (TBS)
Tehran (IKA)
Tel Aviv (TLV)
Thessaloniki (SKG)
Tirana (TIA)
Tokyo (NRT)
Trabzon (TZX)
Tunis (TUN)
Van (VAN)
Varna (VAR)
Venice (VCE)
Vilnius (VNO)
Washington (IAD)
Yaounde (NSI)
Zagreb (ZAG)
Zanzibar (ZNZ)

Turkish Airlines Delayed or Cancelled Flights Claims FAQ

As with all airlines that fly to so many destinations and carry millions of passengers Turkish Airlines is always susceptible to flight delays and cancellations. If you have been delayed on a flight flown by Turkish Airlines then under EU Regulation 261/2004 you are entitled to compensation for your delayed flight, missed connection or if you have been denied boarding by Turkish Airlines.

Use our free flight checker at the top/bottom and side of this page to start your claim. You don't need any information to start your claim apart from the date of your Turkish Airlines flight.

When can I claim compensation from Turkish Airlines?

In accordance to EU Regulation 261/ 2004 passengers are entitled to compensation if they have encounted a flight delay of over 3 hours or if their flight has been cancelled. If you have been denied boarding due to over booking or miss a connection then you are also eligible for compensation.

What are the criteria to claim against Turkish Airlines?

Your flight needs to fulfill some the following criteria:

  • Your flight was from an airport within Europe with ANY AIRLINE
  • Your flight was to an airport within Europe on a European airline
  • Your flight was delayed at least three hours
  • Your flight was cancelled
  • Your flight was full and you were denied boarding
  • Your delay caused you to miss a connecting flight and you didnt arrive at your final destination within 3 hours of the expected arrival time.

Who is allowed to make a claim?

Anyone is allowed to make a flight delay claim. You can also claim for your travelling companions.

Turkish Airlines Flight Delays

13/05/2024 - flight TK1978 from Dublin Airport to Ataturk International Airport

13/05/2024 - flight TK6882 from Manchester Airport to Ataturk International Airport

07/04/2024 - flight TK1974 from Dublin Airport to Ataturk International Airport

07/04/2024 - flight TK1968 from Birmingham International Airport to Ataturk International Airport

04/04/2024 - flight TK6452 from Oslo Gardermoen Airport to London Stansted Airport

24/03/2024 - flight TK1986 from London Heathrow Airport to Ataturk International Airport

23/03/2024 - flight TK1994 from Manchester Airport to Ataturk International Airport

11/03/2024 - flight TK6204 from London Heathrow Airport to Helsinki Vantaa Airport

09/03/2024 - flight TK7821 from London Stansted Airport to Sabiha Gokcen International Airport

21/02/2024 - flight TK1976 from Dublin Airport to Ataturk International Airport

10/02/2024 - flight TK7821 from London Stansted Airport to Sabiha Gokcen International Airport

09/02/2024 - flight TK1982 from London Gatwick Airport to Ataturk International Airport

30/01/2024 - flight TK6900 from Dublin Airport to Ataturk International Airport

23/01/2024 - flight TK7821 from London Stansted Airport to Sabiha Gokcen International Airport

20/01/2024 - flight TK1988 from London Heathrow Airport to Ataturk International Airport

07/01/2024 - flight TK7799 from London Stansted Airport to Sabiha Gokcen International Airport

02/01/2024 - flight TK1964 from London Gatwick Airport to Ataturk International Airport

23/12/2023 - flight TK7821 from London Stansted Airport to Sabiha Gokcen International Airport

21/12/2023 - flight TK1996 from Manchester Airport to Ataturk International Airport

21/12/2023 - flight TK1992 from Manchester Airport to Ataturk International Airport


Free Flight Check

I don´t know my flight code

Start your flight delay claim today!

claim now

Have you flown with Turkish Airlines and had a flight delay, missed connection, cancelled flight or have been denied boarding in the last 6 years? If so try our free flight checker to see how much you may be entitled to in compensation for you AND your fellow travellers.

Start a Claim

From The Blog

Flight Delay Compensation: Is It Worth the Hassle? 20
MAY 24

Flight Delay Compensation: Is It Worth the Hassle?

Many travelers are unaware that they might be entitled to compensation for flight delays, and those who are aware often wonder, "Is it worth the hassle"?

Alternatives to holidaying in Dubai 14
MAY 24

Alternatives to holidaying in Dubai

This blog explores four such alternatives—Oman, Qatar, Jordan, and Abu Dhabi—each offering a blend of modern marvels, cultural depth, and luxurious amenities.

Are You Entitled to Flight Delay Compensation? Find Out Here 07
MAY 24

Are You Entitled to Flight Delay Compensation? Find Out Here

Have you been faced with flight delays. Fortunately, if you are flying in or out of the European Union or UK, you might be entitled to claim.

Why Did My Travel Companion Get Compensation But I Didnt? 20
FEB 24

Why Did My Travel Companion Get Compensation But I Didnt?

Did you and your travel companion experience the same flight delay and only one of you received compensation from the airline? You may be wondering why?

Claiming flight delay compensation against British Airways 23
JAN 24

Claiming flight delay compensation against British Airways

In this comprehensive guide, we will walk you through the step-by-step process of claiming flight delay compensation against British Airways.

Drop Off Charges at the Major UK Airports Explained 15
JAN 24

Drop Off Charges at the Major UK Airports Explained

The days of the free drop off at major airports are long over - many airports have introduced fees to drop off your loved ones even if you are there for a few minutes.

A Comprehensive Guide to Internal Flights in Pakistan 02
JAN 24

A Comprehensive Guide to Internal Flights in Pakistan

Embarking on internal flights within Pakistan opens up a world of possibilities, connecting travelers to various corners of this diverse and enchanting country.

Top Tips for Flying with Young Children 07
DEC 23

Top Tips for Flying with Young Children

Our top-tier expertise brings you the best strategies for flying with young children, ensuring a stress-free and enjoyable journey for everyone involved.

Help my airline has refused to pay compensation! 28
Nov 23

Help my airline has refused to pay compensation!

Encountering a flight disruption is vexing enough, but the added frustration of an airline withholding owed compensation can truly test your patience.

Getting from Manchester Airport to the City Centre 15
NOV 23

Getting from Manchester Airport to the City Centre

In this guide, we will explore getting to Manchester City Centre via four modes of transportation: Train, Metrolink, Taxi, and Bus, breaking down the costs for each.

Adria Airways
Aegean Airlines
Aer Lingus
Aeroflot Russian Airlines
AeroMexico
Air Albania
Air Algerie
Air Arabia
Air Austral
Air Baltic
Air Canada
Air China
Air Corsica
Air Dolomiti
Air Europa
Air France
Air India
Air Malta
Air Mauritius
Air Moldova
Air New Zealand
Air Philippines
Air Senegal International
Air Serbia
Air Transat
Alitalia Express
All Nippon Airways
American Airlines
Arkia Israel Airlines
ASL Airlines
Atlantic Airways
Aurigny Air Services
Austrian Airlines
Avianca
Azerbaijan Airlines
Azores - SATA International
Biman Bangladesh Airlines
Blue Air
Blue Islands
Bluebird Airways
BMI Regional
British Airways
Brussels Airlines
Brussels International Airlines
Bulgaria Air
Buzz Stansted
Cathay Pacific
China Airlines
China Eastern Airlines
Continental Airlines
Corendon Airlines
Croatia Airlines
Cyprus Airways
Czech Airlines
Delta Air Lines
Eastern Airways
easyJet
Egyptair
El Al Israel Airlines
Emirates
Envoy Air
Ethiopian Airlines
Etihad Airways
Eurowings
Finnair
Fly One
Flybe
Flyr
Gol Transportes Areos
Gulf Air
Helvetic Airways
HiSky
Iberia Airlines
Iberia Express
Icelandair
Iran Air
Iraqi Airways
ITA Airways
Japan Airlines
Jazeera Airways
Jet Airways
Jet2
JetBlue Airways
Kenya Airways
KLM
Korean Air
Kuwait Airways
LATAM Airlines
Lauda Europe
Loganair
LOT Polish Airlines
Lufthansa
Luxair
Malaysia Airlines
Norwegian
Nouvelair Tunisie
Pakistan International Airlines
Pegasus Airlines
Play Airlines
Qantas
Qatar Airways
Rossiya Russian Airlines
Royal Air Maroc
Ryanair
SAS
Saudia
Scoot
Silk Way Airlines
Singapore Airlines
Sky Express
South African Airways
SriLankan Airlines
SunExpress
Sunwing Airlines
Surinam Airways
Swiss International
TAP Air Portugal
Thai Airways
Transavia
TUI
Tunisair
Turkish Airlines
Turkmenistan Airlines
Ukraine International Airlines
United Airlines
Vietnam Airlines
Virgin Atlantic
Vueling Airlines
WestJet
Wideroe
Wizz Air