TUI flight delay claim

TUI (formerly knows as Thomson fly) is a UK based mid-cost airline that flies from 20 regional airports to destinations around the world. Flying mainly Boeing 737 the company has invested heavily gradually replacing its old fleet with newer and more economical planes.

Tui destination list

Abeid Amani Karume International (ZNZ)
Adnan Menderes (ADB)
Agadir (AGA)
Ajaccio Napoleon Bonaparte (AJA)
Alicante (ALC)
Almeria (LEI)
AMontego Bay (MBJ)
Antalya (AYT)
Athens International (ATH)
Barbados (BGI)
Beijing Capital International (PEK)
Bergen Flesland (BGO)
Boa Vista (BVC)
Bourgas (BOJ)
Cancun (CUN)
Cochin International (COK)
Colombo International (CMB)
Corfu (CFU)
Crete Chania (CHQ)
Crete Heraklion (HER)
Dalaman (DLM)
Dubrovnik (DBV)
Enfidha Hammamet (NBE)
Faro (FAO)
Florence (FLR)
Fuerteventura (FUE)
Girona Costa Brava (GRO)
Goa (GOI)
Gran Canaria (LPA)
Hartsfield-Jackson Atlanta (ATL)
Hewanorra International (UVF)
Hurghada (HRG)
Ibiza (IBZ)
Innsbruck Airport (INN)
Ivalo (IVL)
Jerez (XRY)
Jomo Kenyatta International (NBO)
Jorge Chavez International (LIM)
Jose Marti International (HAV)
Kalamata International (KLX)
Kavala (KVA)
Kefalonia (EFL)
Kilimanjaro International (JRO)
Kittila (KTT)
Kos (KGS)
Krakow John Paul II International (KRK)
Kuusamo (KAO)
La Palma (SPC)
La Romana (LRM)
Lamezia Terme (SUF)
Langkawi International (LGK)
Lanzarote (ACE)
Larnaca (LCA)
Liberia (LIR)
Los Angeles International (LAX)
Los Cabos International (SJD)
Madeira (FNC)
Malaga Costa del Sol (AGP)
Male (MLE)
Malta (MLA)
Mariscal Sucre International (UIO)
Marrakech (RAK)
Marsa Alam (RMF)
Mauritius (MRU)
Menorca (MAH)
Milas Bodrum (BJV)
Muscat International (MCT)
Naples (NAP)
Newark Liberty International (EWR)
Ngurah Rai International (DPS)
Noi Bai International (HAN)
OPodgorica (TGD)
Orlando International (MCO)
Orlando Sanford (SFB)
Palma de Mallorca (PMI)
Paphos (PFO)
Phu Quoc (PQC)
Phuket (HKT)
Porto Santo (PXO)
Preveza Lefkas (PVK)
Puerto Vallarta (PVR)
Pula (PUY)
Punta Cana (PUJ)
Queen Alia International (AMM)
Queen Beatrix International Airport (AUA)
Ras Al Khaimah International (RKT)
Reus (REU)
Rhodes (RHO)
Rijeka (RJK)
Rovaniemi (RVN)
Sal (SID)
Salzburg Airport (SZG)
Samos (SMI)
Samui International (USM)
Santorini (JTR)
Sardinia Alghero (AHO)
Sde Dov (SDV)
Sicily Catania (CTA)
Skiathos (JSI)
Split (SPU)
Tambo International (JNB)
Tenerife South (TFS)
Thessaloniki (SKG)
U-Tapao International (UTP)
V. C. Bird International (ANU)
Varadero (VRA)
Varna (VAR)
Venice (VCE)
Verona Airport (VRN)
Victoria Falls International (VFA)
Zante (ZTH)

TUI Delayed or Cancelled Flights Claims FAQ

As with all airlines that fly to so many destinations and carry millions of passengers TUI is always susceptible to flight delays and cancellations. If you have been delayed on a flight flown by TUI then under EU Regulation 261/2004 you are entitled to compensation for your delayed flight, missed connection or if you have been denied boarding by TUI.

Use our free flight checker at the top/bottom and side of this page to start your claim. You don't need any information to start your claim apart from the date of your TUI flight.

When can I claim compensation from TUI?

In accordance to EU Regulation 261/ 2004 passengers are entitled to compensation if they have encounted a flight delay of over 3 hours or if their flight has been cancelled. If you have been denied boarding due to over booking or miss a connection then you are also eligible for compensation.

What are the criteria to claim against TUI?

Your flight needs to fulfill some the following criteria:

  • Your flight was from an airport within Europe with ANY AIRLINE
  • Your flight was to an airport within Europe on a European airline
  • Your flight was delayed at least three hours
  • Your flight was cancelled
  • Your flight was full and you were denied boarding
  • Your delay caused you to miss a connecting flight and you didnt arrive at your final destination within 3 hours of the expected arrival time.

Who is allowed to make a claim?

Anyone is allowed to make a flight delay claim. You can also claim for your travelling companions.

TUI Flight Delays

19/05/2024 - flight BY325 from Hurghada International Airport to Bristol Airport

15/05/2024 - flight BY826 from Antalya International Airport to Birmingham International Airport

12/05/2024 - flight BY4661 from Diagoras Airport Rhodes to London Gatwick Airport

09/05/2024 - flight BY2453 from Malta International Airport to Manchester Airport

09/05/2024 - flight BY427 from Antalya International Airport to Birmingham International Airport

09/05/2024 - flight BY2371 from Kos Airport to Manchester Airport

04/05/2024 - flight BY880 from Manchester Airport to Sharm El Sheikh International Airport

29/04/2024 - flight BY535 from Cancun International Airport to Birmingham International Airport

26/04/2024 - flight BY6459 from Larnaca International Airport to Bristol Airport

16/04/2024 - flight BY470 from Hurghada International Airport to Birmingham International Airport

16/04/2024 - flight BY5212 from Palma De Mallorca Airport to London Stansted Airport

09/04/2024 - flight BY702 from Antalya International Airport to Birmingham International Airport

07/04/2024 - flight BY7742 from Birmingham International Airport to Turin Airport

07/04/2024 - flight BY441 from Hurghada International Airport to London Gatwick Airport

06/04/2024 - flight BY4675 from Innsbruck Airport to London Gatwick Airport

06/04/2024 - flight BY4668 from London Gatwick Airport to Fuerteventura Airport

06/04/2024 - flight BY1678 from Glasgow International Airport to Palma De Mallorca Airport

06/04/2024 - flight BY7674 from Birmingham International Airport to Gran Canaria Airport

04/04/2024 - flight BY71 from Melbourne International Airport to London Gatwick Airport

02/04/2024 - flight BY6273 from Palma De Mallorca Airport to Manchester Airport


Free Flight Check

I don´t know my flight code

Start your flight delay claim today!

claim now

Have you flown with TUI and had a flight delay, missed connection, cancelled flight or have been denied boarding in the last 6 years? If so try our free flight checker to see how much you may be entitled to in compensation for you AND your fellow travellers.

Start a Claim

From The Blog

Flight Delay Compensation: Is It Worth the Hassle? 20
MAY 24

Flight Delay Compensation: Is It Worth the Hassle?

Many travelers are unaware that they might be entitled to compensation for flight delays, and those who are aware often wonder, "Is it worth the hassle"?

Alternatives to holidaying in Dubai 14
MAY 24

Alternatives to holidaying in Dubai

This blog explores four such alternatives—Oman, Qatar, Jordan, and Abu Dhabi—each offering a blend of modern marvels, cultural depth, and luxurious amenities.

Are You Entitled to Flight Delay Compensation? Find Out Here 07
MAY 24

Are You Entitled to Flight Delay Compensation? Find Out Here

Have you been faced with flight delays. Fortunately, if you are flying in or out of the European Union or UK, you might be entitled to claim.

Why Did My Travel Companion Get Compensation But I Didnt? 20
FEB 24

Why Did My Travel Companion Get Compensation But I Didnt?

Did you and your travel companion experience the same flight delay and only one of you received compensation from the airline? You may be wondering why?

Claiming flight delay compensation against British Airways 23
JAN 24

Claiming flight delay compensation against British Airways

In this comprehensive guide, we will walk you through the step-by-step process of claiming flight delay compensation against British Airways.

Drop Off Charges at the Major UK Airports Explained 15
JAN 24

Drop Off Charges at the Major UK Airports Explained

The days of the free drop off at major airports are long over - many airports have introduced fees to drop off your loved ones even if you are there for a few minutes.

A Comprehensive Guide to Internal Flights in Pakistan 02
JAN 24

A Comprehensive Guide to Internal Flights in Pakistan

Embarking on internal flights within Pakistan opens up a world of possibilities, connecting travelers to various corners of this diverse and enchanting country.

Top Tips for Flying with Young Children 07
DEC 23

Top Tips for Flying with Young Children

Our top-tier expertise brings you the best strategies for flying with young children, ensuring a stress-free and enjoyable journey for everyone involved.

Help my airline has refused to pay compensation! 28
Nov 23

Help my airline has refused to pay compensation!

Encountering a flight disruption is vexing enough, but the added frustration of an airline withholding owed compensation can truly test your patience.

Getting from Manchester Airport to the City Centre 15
NOV 23

Getting from Manchester Airport to the City Centre

In this guide, we will explore getting to Manchester City Centre via four modes of transportation: Train, Metrolink, Taxi, and Bus, breaking down the costs for each.

Adria Airways
Aegean Airlines
Aer Lingus
Aeroflot Russian Airlines
AeroMexico
Air Albania
Air Algerie
Air Arabia
Air Austral
Air Baltic
Air Canada
Air China
Air Corsica
Air Dolomiti
Air Europa
Air France
Air India
Air Malta
Air Mauritius
Air Moldova
Air New Zealand
Air Philippines
Air Senegal International
Air Serbia
Air Transat
Alitalia Express
All Nippon Airways
American Airlines
Arkia Israel Airlines
ASL Airlines
Atlantic Airways
Aurigny Air Services
Austrian Airlines
Avianca
Azerbaijan Airlines
Azores - SATA International
Biman Bangladesh Airlines
Blue Air
Blue Islands
Bluebird Airways
BMI Regional
British Airways
Brussels Airlines
Brussels International Airlines
Bulgaria Air
Buzz Stansted
Cathay Pacific
China Airlines
China Eastern Airlines
Continental Airlines
Corendon Airlines
Croatia Airlines
Cyprus Airways
Czech Airlines
Delta Air Lines
Eastern Airways
easyJet
Egyptair
El Al Israel Airlines
Emirates
Envoy Air
Ethiopian Airlines
Etihad Airways
Eurowings
Finnair
Fly One
Flybe
Flyr
Gol Transportes Areos
Gulf Air
Helvetic Airways
HiSky
Iberia Airlines
Iberia Express
Icelandair
Iran Air
Iraqi Airways
ITA Airways
Japan Airlines
Jazeera Airways
Jet Airways
Jet2
JetBlue Airways
Kenya Airways
KLM
Korean Air
Kuwait Airways
LATAM Airlines
Lauda Europe
Loganair
LOT Polish Airlines
Lufthansa
Luxair
Malaysia Airlines
Norwegian
Nouvelair Tunisie
Pakistan International Airlines
Pegasus Airlines
Play Airlines
Qantas
Qatar Airways
Rossiya Russian Airlines
Royal Air Maroc
Ryanair
SAS
Saudia
Scoot
Silk Way Airlines
Singapore Airlines
Sky Express
South African Airways
SriLankan Airlines
SunExpress
Sunwing Airlines
Surinam Airways
Swiss International
TAP Air Portugal
Thai Airways
Transavia
TUI
Tunisair
Turkish Airlines
Turkmenistan Airlines
Ukraine International Airlines
United Airlines
Vietnam Airlines
Virgin Atlantic
Vueling Airlines
WestJet
Wideroe
Wizz Air